Autonomous infrastructure

The Autonomous Airbase.

A self-contained station that launches, recovers, recharges and transfers data on a schedule — persistent aerial availability for sites that cannot wait for occasional deployment.

Afaero Autonomous Airbase with a VTOL aircraft docked on the landing deck.
Operating cycle

20+ sorties per 24-hour cycle, unattended.

01

Schedule

Missions are planned and scheduled remotely through the mission software layer.

02

Launch

The station opens and the aircraft departs autonomously on its planned route.

03

Recover

Precision landing returns the aircraft to the protected enclosure.

04

Recharge

Contact charging or a 90-second automated battery swap readies the next sortie.

05

Transfer data

Mission data uploads over LTE with backup connectivity paths.

06

Report

Processed outputs are delivered to dashboards, control rooms and reports.

System architecture

Six integrated layers.

01

Physical enclosure

Weatherproof, dust-rated and UV-resistant station enclosure.

02

Power infrastructure

Grid, solar-hybrid, mobile and UPS auto-switching options.

03

Robotics

Automated battery support and aircraft handling functions.

04

Control logic

Full-cycle automation from scheduling to data upload.

05

Communication

LTE primary, satellite backup and mesh-radio planning.

06

UAV & payload

VTOL-2.4-ready, payload-flexible architecture.

Station specifications

Engineered for African operating conditions.

Station

Total weight
800 kgPermanent installation.
Deployed dimensions
3,000 × 1,500 × 1,500 mmStation footprint from product brochure.
Weather protection
IP55 + Class B lightning rodWeather-protected enclosure.
Peak power draw
≤5 kWStandby draw ≤1.5 kW.
Battery charging
Contact-based automaticAircraft support through the docking station.
Battery swap
90-second automatedAutomated battery exchange cycle.

Resilience

Fire suppression
Integrated automaticStation-level protection system.
Backup power
Independent emergency supplyEmergency supply for resilience.
Environmental control
Full HVACManaged operating environment.
Mast
Wind, rain, temp, RTK, commsIntegrated meteorological and communications mast.
Operating environment
−20 °C to +55 °CTemperature range from product brochure.

Station specifications are sourced from the Afaero Product Brochure 2026 and can be confirmed against the latest engineering documentation during programme engagement.

Deployment configurations

Three ways to put persistence on site.

Grid-connected

Urban industrial deployments for facilities, ports and mining sites with continuous grid power and UPS backup.

Solar-hybrid

Remote mining, forestry and pipeline corridors with 48–72 hour autonomy and no grid connection required.

Mobile / rapid deployment

Vehicle-mounted deployment for disaster response and border operations, designed for 72-hour self-sufficiency and under-2-hour deployment.